
ON (BALL) POINT FOR WHSMITH
One of the K’s leading retailers and long-standing client, WHSmith, contracted Riggotts to carry out works in their Birmingham distribution centre.
With health and safety in mind, the client put major emphasis on improving pedestrian areas and walkways to ensure employee safety throughout the centre. Continuing with the above and beyond attitude, Riggotts has so far undertaken over 1200 meters of single line and over 700 square metres of solid area – all completed out of hours (including weekends) to cause minimum disruption to operations.
In addition, Riggotts assigned their Advanced Surface Preparation Division to initially prepare the surfaces using their state of the art machinery. This allowed the specialist paint crew to efficiently complete their warehouse lining task, keeping the whole job on time and within budget.
Recent news and stories from Riggotts
Is there a universal EV charging bay symbol?
Despite a plea from operators and the public, there isn’t a universal charging bay symbol. In fact, it’s a largely unregulated area, much to the...
Read more
What is anti-skid surfacing?
If you’ve ever driven in heavy weather conditions and found it surprisingly grippy when slowing down, you’ve driven over anti-skid surfacing. Sometimes referred to as...
Read more
Playground markings: What are the rules?
School playground markings are one of the most effective ways to get children active during break time. Hopscotch grids, number trails, or noughts and crosses...
Read more
Would you like to work with us?
Got a query? Need a quote? Call or message us via the website, and we’ll get back to you with an answer. Our team is here to help. We could talk about road marking for hours (but we know you’d prefer we didn’t, so we’ll try to keep it short).


