
On the move for Mobile Mini
Riggotts were contracted by Mobile Mini, a leading provider of secure storage containers and portable site habitation.
We carried out captive shot blasting to prepare surfaces before lining over 1500 metres in their warehouse and applying pedestrian crossings, logos and more.
The work was expertly completed by our team – we never use subcontractors – using a single pack epoxy resin to ensure a swift, efficient and long-lasting result. All of which meant that the Mobile Mini team were on the move again in no time.
Recent news and stories from Riggotts
Solar car parks: Should you be considering the ground-level layout?
Solar carports are expanding quickly in the UK, doubling as a clean-energy source to power nearby buildings while also expanding the EV charging network with...
Read more
Is there a universal EV charging bay symbol?
Despite a plea from operators and the public, there isn’t a universal charging bay symbol. In fact, it’s a largely unregulated area, much to the...
Read more
What is anti-skid surfacing?
If you’ve ever driven in heavy weather conditions and found it surprisingly grippy when slowing down, you’ve driven over anti-skid surfacing. Sometimes referred to as...
Read more
Would you like to work with us?
Got a query? Need a quote? Call or message us via the website, and we’ll get back to you with an answer. Our team is here to help. We could talk about road marking for hours (but we know you’d prefer we didn’t, so we’ll try to keep it short).


