
Battling the elements in Lincoln
Lincoln is undergoing an ambitious regeneration, including a £30m transport hub for the city centre developed by Wilmott Dixon. This includes a large multi-storey car park, which has been completed ahead of schedule. These new timings meant that the car park opening could coincide with the Christmas light switch on.
The weather was not on our side. Bad fog throughout the week resulted in dew on the surface. This made progress painfully slow, as we always complete any job to the highest standards. Our determined team adapted to the challenges and the car park opened on time. The client was over the moon to hand over on schedule, and hundreds of happy people were able to leave their vehicles in the clearly marked car park spaces as they went off to enjoy Lincoln’s festive lights.
Recent news and stories from Riggotts
Is there a universal EV charging bay symbol?
Despite a plea from operators and the public, there isn’t a universal charging bay symbol. In fact, it’s a largely unregulated area, much to the...
Read more
What is anti-skid surfacing?
If you’ve ever driven in heavy weather conditions and found it surprisingly grippy when slowing down, you’ve driven over anti-skid surfacing. Sometimes referred to as...
Read more
Playground markings: What are the rules?
School playground markings are one of the most effective ways to get children active during break time. Hopscotch grids, number trails, or noughts and crosses...
Read more
Would you like to work with us?
Got a query? Need a quote? Call or message us via the website, and we’ll get back to you with an answer. Our team is here to help. We could talk about road marking for hours (but we know you’d prefer we didn’t, so we’ll try to keep it short).


