Category: News

Screenshot_20200121-215722_Messenger-2-1024x746-1.jpg?fit=1024%2C746&ssl=1

Magor Distribution Centre requires a full refresh

24th January 2020by aperturemarketingukNews

The hustle and bustle of a fully functioning distribution centre is hard to compare with – the amount of traffic and other HGV vehicles which roam these vast centres are known offenders for accentuating line marking wear and tear.

To combat such line marking munching machines, Riggotts have the perfect recipe for sustaining and improving the longevity of line markings on-site – correct surface preparation and improved sealing to ensure complete adhesion.

Looking to Wales and stepping back almost 15 years – Riggotts completed this colossal distribution centre for Wilkinsons in Magor, a large village in Monmouthshire, South-East Wales.

The Wilkinsons Distribution centre has been a client of Riggotts for almost 15 years since the site was initially opened 15 years ago. When they required a complete line marking refresh, we knew precisely what to do.

After a significant resurfacing program, one of the Riggotts Thermoplastic teams was on the way to completely reline and refresh the newly finished surface.

With thousands of metres of line marking already completed on the Magor project, the Riggotts team have kept to their stringent time scale – minimising client disruptions.

Togeather, the new thermoplastic line markings and resurfaced tarmac make the perfect conditions for adhesion, extending the life of the line markings.

In addition to improving the aesthetics of the site, the new and improved line markings add to upgraded health and safety while enhancing the efficiency of the highly used roadways.

Improving efficiency doesn’t just improve the speed; it saves valuable time and money, which then can be put to good use elsewhere.

For more information on how our teams can help your business, please contact one of our sales team today via Freephone or Email.

Alternatively, click HERE to be directed through to our services page where you can read about what we can offer your business in more depth.

Distribution Centre Line Markings Distribution Centre Line Markings

image-768x1024-1.jpg?fit=768%2C1024&ssl=1

Distribution Line Markings for VolkerFitzpatrick

15th October 2019by aperturemarketingukNews

One of the UK’s leading engineering and construction companies contacted Riggotts to carry out essential line marking at one of their ongoing projects at a distribution centre.

VolkerFitzpatrick operates in the civil engineering, building and rail industries as a contractor, turning over more than £500m per year and employing over 650 people throughout the UK. As a returning client, VolkerFitzpatrick knew what to expect from the Riggotts team: A high-quality product, on time and to budget.

The project in Riggotts’ sights was a distribution centre, requiring new line marking in both thermoplastic and single pack epoxy spray.

The line marking was required to be clearly defined, durable and well laid out in order to create a safer workspace for employees/customers and improve efficiency in and around the centre. Within the distribution centre grounds, the lines would be heavily trafficked by HGVs and large vehicles, however, the high quality of the product used by the Riggotts operatives meant there wouldn’t be a problem with longevity.

In total, the experienced Riggotts crew completed; 27 disabled logos, 17 EV logos, 16 1200mm letters/numbers, 30 pedestrian logos, 23m2 solid areas, 10,919m 100mm white lining, 22m 300mm white lining, 200m 100mm white hatching, 618m 100mm yellow lining and 571m 100mm yellow hatching. All the lining was carefully carried out to the maximum efficiency to improve the product durability.

With the customer’s best interests at heart, Riggotts managed to complete the required works on time and to budget while providing the distribution centre with crucial line marking which boosted health and safety throughout the site and improved efficiency for the densely trafficked areas.

To learn more about our specialist services, or for any other enquiry, please do not hesitate to get in touch via our Contact Page here or alternatively contact us directly on 0800 8488414.

Distribution Centre Line Markings

20190629_132624-2-1024x498-1.jpg?fit=1024%2C498&ssl=1

Riggotts Go Outdoors in Middlewich Distribution Centre

8th July 2019by aperturemarketingukNews

Go Outdoors, Britain’s largest outdoor clothing and equipment retailer enlisted Riggotts to deliver line markings at their latest distribution centre to improve the health and safety of its distribution centre staff.

The distribution centre in question is non-other than the latest addition to the Go Outdoors property portfolio – the new 353,00 sq ft distribution centre in Middlewich.

The works carried out on-site consisted of over 550m of lining and 14 pedestrian logos, clearly separating parking bays and walkways. All the works carried out on site were firstly shot blasted to promote adhesion, after which the crew laid down single pack epoxy to ensure longevity – securing the safety of the workers at the Middlewich site.

Boasting over 25 years’ experience helping companies make their workplaces a safer environment, Riggotts have proved to stand the test of time and produce high-quality services that don’t disappoint.

For more information on this project and see how Riggotts can help your business get in touch today.

Distribution Centre Line Marking - Cheshire

Distribution Centre Line Marking - Cheshire

Riggotts Line Marking

Service brochure

Service Brochure 2020

Approved Contractors