Repair and Refurbishing Thermoplastic for UK Container Maintenance
29th August 2018by galinar84News
First-time clients, UK Container Maintenance, contracted Riggotts to carry out over 1200m of line marking. The project included: 21 pedestrian logos, lettering, roadways, and pedestrian crossings. The Internal works were completed in Single Pack Epoxy and sealed following rigorous preparation to the surface area to ensure a durable finish. Externally, to enable longevity and durability, the finished works were carried out in Thermoplastic thus securing good adhesion to the surface.